检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]空军工程大学防空反导学院,陕西西安710051
出 处:《机械设计与制造》2014年第2期199-202,共4页Machinery Design & Manufacture
基 金:国家自然科学基金(51075395)
摘 要:针对某六自由度吊机吊装轨迹规划问题,采用一种时间最优和能量最省相结合为目标的轨迹规划方法。利用DH算法建立某型机械吊机的运动学模型,建立其正运动学和逆运动学方程。为解决吊机在静态环境下点到点的轨迹规划问题,应用基于粒子群算法的五段三次多项式插值轨迹规划算法对关节轨迹进行时间和能量优化求解得到最优路径。最后,对此模型进行了数值仿真。仿真结果表明关节轨迹平滑连续,保证了边界条件,验证了所提方法的有效性。A planning procedure for the target of time-optimal combined with energy-optimal was proposed aimed at the erection trajectory planning of 6-degree-of-freedom crane. Using D-H method to conduct the kinematics model of a certain mechanical crane and to build the forward, and inverse kinematics equation. To plan the point-to-point trajectories for crane working in a statics environment, the 3-3-3-3-3 piecewise polynomial interpolation trajectory planning algorithm based on PSO algorithm and based on time-optimal and energy-optimal are used to approach the optimal trajectories of the joint angles. The particle swarm optimization is implemented, so that the planned joint angle trajectories are smooth and continuous and boundary condition is satisfied. Numerical simulation results demonstrate that the proposed method is effective and available.
分 类 号:TH16[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222