检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学航空航天与力学学院,上海200092 [2]同济大学土木工程学院地下建筑与工程系,上海200092 [3]同济大学岩土及地下工程教育部重点实验室,上海200092
出 处:《固体力学学报》2014年第1期85-94,共10页Chinese Journal of Solid Mechanics
基 金:上海市自然科学基金项目(11ZR1438700);国家杰出青年基金项目(51025932);国家自然科学基金项目(10702052)资助
摘 要:工程中存在一类几何边界随时间变化的变边界结构,例如土木工程中处于施工阶段的结构.论文以粘弹性岩体中隧道开挖为背景,尝试用变边界问题对应关系和平面弹性复变方法求取无限平面中椭圆孔口自相似变边界情况下的解析解答.首先建立了复变函数法求解变边界粘弹性问题的基本步骤和公式.然后通过建立逆映射函数将已知ζ平面复位势转至z平面,解耦参与拉普拉斯变换的时间与孔口映射函数所带来的时间,从而导出了粘弹性类材料的应力与位移的统一表达.作为一个例子,论文选择Boltzmann粘弹性模型,代入模型参数后得到积分形式的位移、应力解析解,通过与数值解的比较验证了该解答的可靠性,并通过一个算例分析了变边界过程对位移、应力的影响.分析结果显示,采用不同变边界过程的位移、应力变化形态和数值均有差别.论文解答可用于进行地下椭圆孔型隧道在开挖过程中的力学分析,为实际工程提供初步设计的手段.此外,本文给出的方法可用于推导任意形状孔型变边界问题的解答.The structures involving time-dependent boundary regions are commonly encountered in engineering,i.e.structures under construction in civil engineering.For tunnel excavations in rheological rock mass,this paper presents the analytical solutions of problem with elliptical hole in viscoelastic infinite plane by using the complex variable method and corresponding principle of time-dependent boundary problem. First,basic formulations of complex variable method are established for general viscoelastic problems involving time-dependent boundary regions.Then,based on the derived potentials with respect toζin the reference,the potentials in z-plane are obtained by introducing the inverse mapping function,and therefore the variable t used in Laplace transformation is decoupled with the t which comes from mapping function.At last,the expressions of displacement and stress are derived for the general cases of viscoelasticity.In addition,the Boltzmann viscoelastic model is chosen as an example to obtain the exact solutions of stress and displacement in integral form by substituting the material parameters into the general expressions.The comparison between the specific analytical and FEM solutions is made to validate the correctness of the derivation and further analyses are performed to illustrate the influence of boundary varying process on the relationship between stress(displacement)and time.The results show that the variations of displacement and stress are correlated with boundary varying speeds.The solutions can be used in mechanical analysis and preliminary design of underground elliptical tunnel excavation.Furthermore,the method in this paper is also suitable for the analysis of the underground excavation problems in arbitrary sharp.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145