检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱文展[1]
机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063
出 处:《铁道标准设计》2014年第3期38-41,共4页Railway Standard Design
摘 要:根据东南沿海港口和临港工业的发展及港口铁路支线建设对铁路货物运输的迫切需求,结合《中长期铁路网规划(2008年调整)》中沿海铁路通道规划格局,分析沿海铁路通道客货运需求及不同区段客货运量特点、通道货流构成及流向特征、沿海港口铁路支线后方集疏运通道径路及特点。根据既有沿海铁路建设标准、货运设施分布、能力适应性和运输模式,分析目前制约货物运输的主要因素;结合沿海铁路功能定位和运输能力,提出阶段性解决通道货物运输的建议意见。With the development of both the southeast coastal ports as well as port industries, together with the construction of port railway branch lines, there was an urgent need for railway freight transportation in this coastal region. Therefore, according to the coastal railway planning mode specified in Medium and Long Term Railway Network Plan (revised in 2008) , this paper analyzed relevant issues of the coastal port railway, including the passenger and freight transport demand and volume features at different areas, the cargo constitute and flow direction features, the paths and features of collecting and distributing system behind the port railway branch lines. Furthermore, according to the existing coastal railway construction standard, freight transport facility distribution, capacity adaptability and the transportation mode, this paper analyzed the main factors which have influence on the freight transport. Finally, in combination with functional orientation and transportation ability of coastal railway, this paper suggested an idea that the issue of freight transportation of coastal railway should be settled in a multi-stage mode.
分 类 号:U29[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145