铁路拱形防风明洞风荷载研究  被引量:7

Study of Wind Load on Arched Anti-wind Opencut Tunnel for Railway

在线阅读下载全文

作  者:靳宝成[1] 

机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043

出  处:《铁道标准设计》2014年第4期61-64,共4页Railway Standard Design

摘  要:兰新铁路第二双线穿过著名的百里风区、三十里风区,其风害极为严重。为了最大限度地减少限速和停轮,在百里风区的核心区采用设置防风明洞的防护措施。通过CFD数值模拟与风洞模型试验研究,得出了作用在防风明洞表面的风荷载随风速增大而增大,且迎风侧为正压、背风侧及拱顶为负压的分布规律。The second double-tracked Lanzhou-Xinjiang Railway passes through the famous“100 km wind zone” and“30 km wind zone” where the wind hazards are very serious. Therefore, in order to minimize both speed limitaiton and wheel stopping, the anti-wind opencut tunnel was installed as a prevention measure at the core area of“100 km wind zone”. In this study, after the CFD numerical simulation as well as wind-tunnel model experiment and research, the distribution pattern of wind load acting on the anti-wind opencut tunnel surface was ascertained as follows: the wind load will increase with the increasing of wind speed;the wind load presentes positive pressure on the windward side, and presents negative pressure on the leeward side and on the arch crown.

关 键 词:防风明洞 风荷载 分布规律 

分 类 号:U213.154[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象