检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王莉[1,2] 谭卓英[1,2] 朱博浩[3] 周喻[1,2]
机构地区:[1]北京科技大学土木与环境工程学院,北京100083 [2]北京科技大学金属矿山高效开采与安全教育部重点实验室,北京100083 [3]北京市建筑设计研究院,北京100045
出 处:《岩土力学》2014年第3期827-834,共8页Rock and Soil Mechanics
基 金:国家自然科学基金(No.51174013);973课题(No.2010CB731501);长江学者和创新团队发展计划(No.IRT0950)
摘 要:以江西城门山铜矿城门湖区软基土石坝为研究对象,基于淤泥流动过程中的冲击力特性,采用FLAC3D程序模拟和分析了淤泥冲击挤压作用下软基土石坝的水平速率、水平位移和剪应变等动态响应。研究结果表明:(1)坝体速率变化规律与冲击挤压作用周期基本一致。坝体监测点速率大小及发生运动的区域均随时间增加而增大。约在0.3 s(1/2周期)时,速率达到最大值;而约在0.45 s(3/4周期)时,发生运动的区域达到最大;之后随着冲击荷载的衰减坝体质点逐渐趋于静止。(2)淤泥冲击挤压作用下坝体发生了永久位移,平均位移值约30 mm,可看作坝身整体向下游侧移动了30 mm。(3)坝体内形成了一条明显的剪应变增量贯通带,发生区域位于上层软土坝基内,表明坝体最可能沿此位置发生整体滑动失稳破坏。The soft foundation earth-rock dam in the Chengmen lake in Chengmenshan copper mine of Jiangxi province was selected as a case study. Based on the characteristics of impact force during the silt flowing process, FLAC3D program was used to simulate and analyze the dynamic response of earth-rock dam, such as the horizontal velocity, displacement and shear strain, under the impact-squeezing action of silt. The research results are drawn as follows: (1) The variation law of the dam velocity is basically identical with the period of the impact-squeezing action. The monitoring point velocity and motion region in dam increase with the time. The monitoring point velocity reaches the maximum at about 0.3 s (1/2 period);while the motion region reaches the maximum at about 0.45 s (3/4 period). Afterwards, the dam tends to be static with the attenuation of the impact force. (2) Permanent displacement happens in the dam under the impact-squeezing action of silt. The average displacement is 30 mm, which can be seen that the whole dam moves 30 mm towards the downstream. (3) An obvious coalescence zone of shear strain increment generated in the dam is located in the upper soft foundation of the dam, which indicates that the dam will probably slide and damage along this coalescence zone.
分 类 号:TV641[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.78