检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南水北调中线干线工程建设管理局,北京100038
出 处:《南水北调与水利科技》2014年第B01期73-74,138,共3页South-to-North Water Transfers and Water Science & Technology
摘 要:由于工程建设的复杂性,工程变更与索赔处理是工程建设中经常发生的事情。工程变更与索赔事件发生后,首先要依据合同条件分析工程变更与索赔的成立条件及责任划分。但是,一方面,由于某些合同条款存在瑕疵或不完善,另一方面,由于当事人对合同条款理解的立场和观点不同,导致合同双方对某些工程变更与索赔的处理存在较大争议。争议焦点往往在于对合同条款的理解。Because of the complexity of the engineering construction, engineering change and claim processing is often occurs in the engineering construction. Engineering change and claim after the incident, first according to the conditions of engineering change and claim the contract condi- tions and division of responsibility. However, on the one hand, because some of the terms of the contract are defective or inadequate, on the other hand,due to the position on the terms of the contract and understand the different point of view, leading to more controversial parties on some engineering changes and claims. The focus of controversy often lies in the understanding of the terms.
分 类 号:TV68[水利工程—水利水电工程] TV512
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222