检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田学伟[1]
机构地区:[1]铁道第三勘察设计院集团有限公司,天津300142
出 处:《路基工程》2014年第2期217-220,共4页Subgrade Engineering
摘 要:东北某铁路扩能改造工程拟提速至160 km/h,既有路基基床病害较为严重,大范围需进行病害治理及基床加固处理。经过调查分析既有线的历史、现状和病害原因,初步探讨基床加固承载力标准,确定较为经济合理的基床加固方案。A railway in the Northeast, after capacity expansion and reformation engineering, could speed up to 160 km/h. There have relatively serious subgrade diseases on the existing line, hence large range of disease treatment and subgrade reinforcement was required. By the investigation of the existing line's past and current situation and the analysis of the diseases causes, preliminary study was made in relation to the standard of subgrade bearing capacity so as to have a subgrade bed reinforcement scheme economic and reasonable.
分 类 号:U216.412[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.146.235