通用ATS并行测试的任务调度模型研究  被引量:1

Study on Oriented Task Schedule of General ATS Parallel Test

在线阅读下载全文

作  者:卢慧卿[1] 方丹[1] 许爱华[2] 

机构地区:[1]军械工程学院导弹工程系,石家庄050003 [2]武汉军械士官学校,武汉430075

出  处:《计算机测量与控制》2014年第4期1033-1035,1038,共4页Computer Measurement &Control

摘  要:为了保证测试任务正确高效地完成,介绍了通用自动测试系统体系结构,构建了并行测试软件模型;在测试资源模型和测试任务模型的基础上,研究了任务调度的一般性问题,建立了任务调度的数学模型;总结了影响任务调度的主要因素,针对3种并行测试硬件模型下不同的资源方式,分析了其具体任务调度问题;为后续研究任务调度算法及其实现奠定了理论基础。In order to accomplish the test tasks exactly and quickly, the general ATS architecture is presented, and software model of parallel test in ATS is built; based on test resource model and test tasks model, the general problems of task scheduling are studied, and mathematical modeling on task scheduling are built; the primary factors that affect task scheduling are summarized, the particular task sched- uling problems are also analyzed under the different resource methods of three models. Such work lays foundation for succeeding research: task scheduling arithmetic making and realizing in ATS parallel test.

关 键 词:自动测试系统 并行测试 软件模型 任务调度 

分 类 号:TP274[自动化与计算机技术—检测技术与自动化装置]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象