检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京交通大学土木建筑工程学院,北京100044
出 处:《中国安全生产科学技术》2014年第3期61-66,共6页Journal of Safety Science and Technology
基 金:国家自然科学基金项目(51278044)
摘 要:下穿施工引起既有地铁结构发生沉降变形及内力变化,同时导致地铁变形缝处产生沉降差(错台)及张开,从而影响地铁结构安全及行车安全。针对不同穿越位置,采用打靶法对微分方程进行数值求解,从地铁结构变形程度、内力变化规律、变形缝沉降差(错台)及张开量的变化趋势这四个方面进行了计算、分析。结果显示:中心位置穿越时,地铁结构的最大沉降值低于其它穿越位置,同时变形缝沉降差较小,基本未张开。从结构安全和行车安全两个方面综合判断,中心穿越是最优的穿越位置。The settlement and the internal forces of existing subway tunnel due to underlying tunneling can lead to two indexes: differential settlement at the joint and opening distance of the joint, thus affect the subway structures and traffic safety. Aiming at different across locations, the shooting method was applied to solve the equations, and the analysis included four aspects: the settlement of existing subway, the internal force variation, the differential settlement at the joint and opening distance of the joint. Results showed that: when the underlying tunneling cross- ing at the center, the maximum settlement of the subway structure isless than other positions, while the differential settlement and opening distance of the joint remains a low level. By judging from the structural safety and traffic safety, the crossing at the center is optimal.
分 类 号:X951[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3