马钢二铁总厂烧结过程热工测试与分析  

Thermal measurement and analysis of sintering process in No.2 Ironmaking Plant of Masteel

在线阅读下载全文

作  者:武轶[1] 金俊[1] 李小静[1] 熊德怀[1] 陈东峰[1] 

机构地区:[1]马鞍山钢铁股份有限公司技术中心,安徽马鞍山243000

出  处:《钢铁研究》2014年第3期39-42,50,共5页Research on Iron and Steel

摘  要:为了评价烧结过程的热利用效率,找出无效热能消耗,进而降低烧结矿固体燃耗,采用改进的烧结热工测试方法,对马钢二铁总厂1号烧结机进行了热工测试。结果表明,马钢二铁总厂1号烧结机的烧结过程热效率仅54.28%,低于宝钢60%~66%的热效率水平,针对这种情况及测试中发现的一些问题,提出了相关的建议。In order to evaluate thermal utilization efficiency of sintering process and tofind out the invalid heat consumption for decreasing the solid fuel consumption of sinter,thermal measurement of No. 1 sinter machine in No. 2 Ironmaking Plant of Masteel wascarried out by the improved thermal testing method. The results showed that thethermal efficiency of sintering process of the sinter machine was only 54. 28 %, lowerthan that of Baosteel (60 %- 66 %). Considering this situation and some problems,correlated suggestions were put forward.

关 键 词:烧结 热工测试 热利用 

分 类 号:TF046.4[冶金工程—冶金物理化学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象