检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海申通地铁集团技术中心,上海高级工程师201103 [2]同济大学结构工程与防灾研究所,200090
出 处:《城市轨道交通研究》2014年第6期37-41,共5页Urban Mass Transit
摘 要:对上海在建地铁隧道盾构掘进及轨道铺设施工中运输车辆运行引起的环境振动进行了现场实测,分析了施工运输车辆运行引起隧道内振动的时频特性,并与地铁列车运行引起的振动进行了对比.实测结果表明:盾构电瓶车产生的隧道内振动卓越频段为10~100 Hz;而轨道车运行引起的隧道内振动卓越频段为40~100 Hz.轨道车在不同运行车速条件下的对比测试结果表明,所引起隧道内的振动随轨道车车速的增大而增大,当车速由5 km/h增至20 km/h时,道床和隧道壁的最大Z振级分别增大15 dB和11 dB.On-the-spot experimental measurements of vibrations in metro tunnel have been undertaken in Shanghai,which are induced by transport vehicles during shield tunneling and track laying.The frequency domain of tunnel sections recorded in the running of transport vehicles is analyzed and compared with that of the metro trains.Results show that the dominating frequency content caused by shield battery car is situated in the frequency range of 10~ 100 Hz,and that caused by metro trains is about 40~ 100 Hz.In addition,a comparative measurement result about varying train speeds shows that higher speed will cuase higher vibration in the tunnel.When a test train runs at the speed from 5 km/h to 20 km/h,the maximum Z vibration level on the ballast bed and tunnel walls will increase to 15 and 11 dB respectively.
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229