兰渝铁路西秦岭特长隧道方案研究  被引量:19

Construction Scheme of the West Qinling Extra-Long Tunnel on the Lanzhou-Chongqing Railway

在线阅读下载全文

作  者:李国良[1] 司剑钧[1] 李宁[1] 

机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043

出  处:《现代隧道技术》2014年第3期7-14,共8页Modern Tunnelling Technology

摘  要:西秦岭特长隧道是目前中国铁路建设史上采用TBM掘进最长的隧道,设计为两座单线隧道,采用钻爆法和TBM相结合的施工方案进行施工。文章结合该隧道的环境及工程、水文地质情况,对方案比选及其TBM施工特点及工程适应性、隧道衬砌断面及其支护参数设计、TBM掘进与同步衬砌、连续皮带机出碴等关键技术方案进行了分析论述,并介绍了TBM设备和隧道的施工概况。The West Qinling extra-long tunnel, the longest TBM-driven tunnel in China's railway history, is a double-tube single-track tunnel being constructed using a combination of the drill and blast and TBM methods. Based on environmental and hydrogeological conditions, this paper analyzes: a construction scheme comparison; construction characteristics; the engineering adaptability of the TBM, the design of tunnel lining section and its support parameters; the synchronization of lining and TBM driving; and continuous conveyor belt mucking. It also introduces general information regarding the TBM equipment and tunnel construction.

关 键 词:铁路隧道 方案比选 TBM 钻爆法 

分 类 号:U455.42[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象