检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《现代隧道技术》2014年第3期7-14,共8页Modern Tunnelling Technology
摘 要:西秦岭特长隧道是目前中国铁路建设史上采用TBM掘进最长的隧道,设计为两座单线隧道,采用钻爆法和TBM相结合的施工方案进行施工。文章结合该隧道的环境及工程、水文地质情况,对方案比选及其TBM施工特点及工程适应性、隧道衬砌断面及其支护参数设计、TBM掘进与同步衬砌、连续皮带机出碴等关键技术方案进行了分析论述,并介绍了TBM设备和隧道的施工概况。The West Qinling extra-long tunnel, the longest TBM-driven tunnel in China's railway history, is a double-tube single-track tunnel being constructed using a combination of the drill and blast and TBM methods. Based on environmental and hydrogeological conditions, this paper analyzes: a construction scheme comparison; construction characteristics; the engineering adaptability of the TBM, the design of tunnel lining section and its support parameters; the synchronization of lining and TBM driving; and continuous conveyor belt mucking. It also introduces general information regarding the TBM equipment and tunnel construction.
分 类 号:U455.42[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112