四川西南部山区风电场工程水土流失预测浅析  被引量:4

The Prediction Analysis of Water and Soil Loss in the Wind Power Field Project in the Southwestern Mountainous Area of Sichuan Province

在线阅读下载全文

作  者:尹武君[1] 王健[2] 陈金龙 

机构地区:[1]四川电力设计咨询有限责任公司,成都610021 [2]西北农林科技大学资源环境学院,陕西杨凌712100 [3]彭山县水务局,四川彭山620860

出  处:《四川环境》2014年第3期113-119,共7页Sichuan Environment

摘  要:本文介绍了凉山州长海子风电场工程水土流失预测范围与时段、内容与方法。通过采用类比工程法进行预测,得到了水土流失预测结果,确定了风电场水土流失重点区域为交通设施区、弃渣场区,水土流失主要时段为施工期。据此预测结果,为工程在建设过程中提出了水土保持设计建议。This paper introduced the range and periods,contents and methods of the prediction about water and soil loss in wind power field.By using the engineering analogy method,the obtained prediction results of water and soil loss showed that the most serious area were traffic facility region and waste slag region,and the main period of water and soil loss was during the construction period.On the basis of prediction results,this paper proposed design suggestions about of water and soil loss in the construction process of the project.

关 键 词:风电场 水土流失 水土流失预测 侵蚀模数 

分 类 号:X143[环境科学与工程—环境科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象