摘 要:凤凰山隧道在距进口210~250 m处与沟壑平交,导致洞身21 m浅埋有17 m拱顶外露,因明挖施工存在诸多困难故采用暗挖。通过方案比选,采用在隧道两侧先施作多根锚固桩,桩顶现筑钢筋混凝土纵梁和套拱,并在拱外回填土后实施暗挖。介绍了施工流程、技术要求以及注意事项,实际施工中取得良好效果。The Fenghuangshan Tunnel crosses ravine at the position 210 ~ 250 m away from the entrance, causing the 21 m shallow tunnel trunk has a 17 m section of vault exposed. Since open excavation has many difficulties, tunneling method was adopted. Through scheme comparison, the method, in which several anchoring piles are exerted at both sides of tunnel at first ; then reinforced concrete longitudinal beam and cover arch are placed on the pile top; at last, tunneling is carried out after backfilling outside arch with soil, was used. In the paper, the construction process, technical requirement and precautions were introduced. In practice construction, good effect was reached.
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.225.54.37