新隧道垂直穿越已建隧道的计算分析  被引量:8

Calculation Analysis of the Deformation of the Existing Tunnel Influenced by the New Tunnel Underpassing

在线阅读下载全文

作  者:李强[1] 曾德顺[1] 

机构地区:[1]同济大学特种土木工程技术研究所

出  处:《地下工程与隧道》2001年第2期14-18,共5页Underground Engineering and Tunnels

摘  要:采用三维有限元模拟盾构推进的过程,是研究盾构施工中土层移动的最有效的手段,在真实模拟施工情况的基础上,研究了新隧道从老隧道下面垂直穿过时,对老隧道的变形影响情况。研究表明,推进力和稳定比 N 是影响老隧道变形的主要因素。Using three dimensional finite element method to simulate the shield tunneling is the most efficient measure to study the ground movement during shield tunneling. By using three dimensional elastic-plastic finite element method to simulate the shield tunneling factually, the paper introduces the study of impact on deformation of existing tunnel when a new tunnel crosses perpendicularly under the existing tunnel. The study shows the driving force and the stabilization ratio N are the main factors that may affect the deformation of the existing tun- nel.

关 键 词:隧道 有限元 稳定系数N 计算分析 已建隧道 变形影响 盾构施工 

分 类 号:U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象