检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:窦国仁[1]
出 处:《水运工程》1999年第10期36-39,共4页Port & Waterway Engineering
摘 要:长江口深水航道治理工程的一期工程正在顺利实施, 二、三期工程有待继续。该项宏伟工程能否取得预期效果, 关键在于泥沙回淤问题。文章简要介绍以泥沙数学模型为主, 以泥沙物理模型为辅的研究手段和对泥沙数模的验证; 分析了长江口深水航道的治理原则和治理工程的作用; 对关注的主要问题进行了讨论。The first stage of the regulation project for deep navigation channel is under construction with success, and the second and third stages of the project are to be continued The success of the project is dependent on the solution of the sedimentation problems These are studied mainly by the numerical model of sediment transport, meanwhile some physical studies on sediment transport come to its assistance The verification of mathematical model of sediment transport is presented The principles and effects of the regulation works are analyzed, and some questions attracting people's attentions are discussed
关 键 词:航道 泥沙 模型 长江口深水航道治理工程 回淤 分析 治理原则
分 类 号:U617.6[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145