黄河口挖河疏浚道路风沙污染分析  被引量:1

Analysis on Wind-Sand Pollution on Roads during Channel Excavation Dredging in the Reach of Yellow River Mouth

在线阅读下载全文

作  者:程义吉[1] 曹文洪[2] 陈东[2] 

机构地区:[1]黄河口治理研究所,山东东营257091 [2]中国水利水电科学研究院,北京100044

出  处:《泥沙研究》2001年第4期53-56,共4页Journal of Sediment Research

基  金:国家自然科学基金和水利部联合资助项目 (5 9890 2 0 0 )

摘  要:黄河下游挖河疏浚固堤启动工程在黄河口断流河段采用了机械清淤方法 ,施工期间由于天气干旱 ,汽车跑动和风力作用等 ,对施工区周围环境造成一定污染。本文采用实测资料和理论分析相结合的方法对道路风沙起动和扬起输移的范围进行了研究 ,并提出防治措施 ,为今后大规模挖河疏浚提供参考。The mechanization of dredging has been adopted in the channel excavation dredging and dykes reinforcing work in the reach of the Yellow River mouth. Owing to arid climate, car running and wind forces etc., wind-sand pollution influenced the surrounding environment on a certain extent. This paper studied the incipient motion and transport of wind-sand on roads by means of measured data and theoretical analysis, proposed some harnessing measures and provided some experiences for a large scale of channel excavation dredging in the future.

关 键 词:挖河疏浚 风沙 环境 固堤 黄河口 

分 类 号:TV851[水利工程—水利水电工程] TV871

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象