检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏纲[1,3] 陆世杰 WEI Gang;LU Shijie(Department of Civil Engineering,Zhejiang University City College,Hangzhou,Zhejiang 310015,China;College of Civil Engineering and Architecture,Zhejiang University,Hangzhou,Zhejiang 310058,China)
机构地区:[1]浙江大学城市学院土木工程系,浙江杭州310015 [2]浙江大学建筑工程学院,浙江杭州310058 [3]宁波大学
出 处:《岩石力学与工程学报》2018年第A02期4329-4337,共9页Chinese Journal of Rock Mechanics and Engineering
基 金:国家自然科学基金资助项目(51178428);浙江省自然科学基金资助项目(LZ12E08001)~~
摘 要:利用三角函数拟合潮汐荷载,计算潮汐荷载作用下河床土层的一维非线性固结沉降。基于Winkler地基模型,依据潮汐荷载和土层沉降反算不同时刻的等效基床系数。考虑接头作用,建立管节-接头计算模型,分析潮汐影响下的沉管隧道管节竖向位移。依托宁波甬江沉管隧道工程,计算管节中点和接头竖向位移随潮位的变化,并将理论计算结果与实测结果进行对比分析。研究结果表明:J2接头截面竖向位移计算变化量与实测变化量较为吻合,表明本文提出的理论计算方法合理;潮汐影响下甬江隧道沉管段的浮动范围为4~8mm,最大浮动量出现在E3管节中点截面,其中日浮动量和年浮动量分别达到6.9和7.4mm;同一管节截面的年浮动量稍大于日浮动量,且呈现正相关性;同一管节中,中点浮动量大于接头浮动量,而不同管节的同一位置截面中,越靠近隧道中点的浮动量越大。Tidal load is fitted by trigonometric function,and One-dimensional nonlinear consolidation settlement of layered soils is calculated under tidal load. Based on the tidal load and the result of subsurface settlement,Winkler foundation model is used to calculated equivalent subgrade coefficient at different time. Considering the effect of joint,an element-joint model is built to analyze the vertical displacement of immersed tunnel elements under tidal load. Rely on Yongjiang Immersed Tunnel in Ningbo,the vertical displacement of joints and the midpoint of the elements is calculated under tidal load,and the theoretical results are compared with the measured results. The study shows that the calculated vertical displacements of Joint 2 are consistent with the monitoring data. It provides validation of the proposed method. The range of vertical displacement amplitude of Yongjiang Immersed Tunnel's elements is 4–8 mm under tidal load. The maximum displacement amplitude is present to the midpoint of Element 3. The displacement amplitude of Element 3 in a day and in a year reaches 6.9 mm and 7.4 mm respectively. As for one section of an element,its displacement amplitude in a day is slightly larger than that in a year,and they are positively correlated in different sections. As for one element,its displacement amplitude of midpoint is larger than that of joints. As for the same position of different elements,the closer to the midpoint of tunnel the section is,the lager the displacement amplitude is.
关 键 词:隧道工程 沉管隧道 潮汐荷载 非线性固结 接头 竖向位移
分 类 号:U459.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.141.193