检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛光辉[1] 管健 程继杰 张昊[1] 纪伟亮 景新平 吴淼[1] XUE Guanghui;GUAN Jian;CHENG Jijie;ZHANG Hao;JI Weiliang;JING Xinping;WU Miao(School of Mechanical,Electrical &Information Engineering,China University of Mining and Technology (Betting),Beijing 100083,China)
机构地区:[1]中国矿业大学(北京)机电与信息工程学院,北京100083
出 处:《煤炭科学技术》2018年第12期15-20,共6页Coal Science and Technology
基 金:国家重点基础研究计划(973计划)资助项目(2014CB046306);中央高校基本科研业务费专项资金资助项目(2009QJ16)
摘 要:针对综掘工作面环境恶劣,掘支锚时间比例严重失调现状,提出了一种新型综掘巷道超前支护机组,具有超前支护、多工位并行作业的特点。介绍了该支护机组的结构组成和工作原理,重点讨论了该支护机组的关键装备超前支架的结构和力学模型。以旗山矿地质条件为例利用FLAC^(3D)软件,基于围岩—超前支架力学耦合模型仿真计算得到超前支架的载荷,导入Ansys软件并计算得到支架整体和各零件的应力云图、位移云图,分析了支架的应力和应变情况。仿真结果表明:支架的最大位移为8 mm,与支架整体尺寸相比可以忽略,最大应力为737.84 MPa,小于材料的屈服强度890 MPa,故所设计的支架能够承受该矿围岩的压力,支架的薄弱环节为顶梁、伸缩梁和护帮板,在后续的工程设计时应予以重视。此方法可实现掘支锚平行作业,巷道的快速掘进和安全生产,可为综掘巷道超前支护提供新的思路。Aiming at the situation that environment of fully-mechanized heading faces is bad and the time ratios of excavating,supporting and anchoring are seriously out of balance,a new type of advance supporting unit is proposed,which has the characteristics of advanced support and multistage parallel operation.The structure and working principle of the support unit are introduced.The structure and mechanical model of the key equipment of the support unit are mainly discussed.Considering Qishan colliery geological conditions,the load of advance support was obtained through simulation with FLAC3D software based on surrounding rock-support mechanical coupling model,and then imported into the Ansys software to obtain the support of stress nephogram and displacement contours as a whole and the parts by calculation and to analyze the stress and strain of advance support.The simulation results show that the maximum displacement of the support is 8 mm,which is negligible compared with the overall size of the support.The maximum stress is 790 MPa,which is less than the yield strength of the material is 890 MPa.Therefore,the support can withstand the pressure of surrounding rock of Qishan Coal Mine.The weak parts are top beam,telescopic girder and side-guard board.In the subsequent engineering should attach importance to it.This method can realize the parallel operation of the excavating,supporting and anchoring,and the rapid excavation and safe production in the fully-mechanized heading faces.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249