检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国铁路总公司资金清算中心信息处,北京100844 [2]中国铁道科学研究院电子计算技术研究所,北京100081
出 处:《铁路计算机应用》2014年第5期28-31,共4页Railway Computer Application
摘 要:为了解决铁路旅客运输清算系统海量数据与存储空间不足之间的矛盾,本文紧密结合业务实际,立足全局,从系统化角度提出了一套完整的存储管理系统方案,包括系统设计目标,处理流程,架构设计,系统实现,以及配套的管理规划。实践证明,客运清算存储管理系统设计方案合理,运行高效,达到系统设计目标,并为清算系统优化创造了有利条件。In order to solve the contradiction between the storage space and mass data of Clearing Shortage System for the railway passenger transport,this paper combined with the actual business,based on the overall situation,proposed a complete set of Storage Management System from the point of system,including system design,process flow,architecture design,system implementation,and supporting management planning.Proved by practice,the result indicated that the System was reasonable,efficient,reached to the design target,and proved favorable conditions in system optimization.
分 类 号:U293.2[交通运输工程—交通运输规划与管理] TP39[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33