液压大型抓斗上下横梁与铲体制作工艺与方法研究  

Study on the Manufacturing Techniques & Methods for the Hydraulic Grab's Upper Beams,Lower Beams and the Grab's Body

在线阅读下载全文

作  者:施洪慧 

机构地区:[1]领新(南通)重工有限公司工程技术研发中心,江苏南通226017

出  处:《南通航运职业技术学院学报》2014年第2期64-67,共4页Journal of Nantong Vocational & Technical Shipping College

摘  要:文章通过对18m3抓斗的上下横梁和铲体关键的铰链装配、焊接及机加工工艺的改进,配备一定的辅助工装,解决了机加工难、焊接应力集中、焊接变形等问题,满足了图纸要求的同轴度,使得抓斗的开启闭合符合图纸工况要求。Based on a study of the improvement on the assembly,welding and machining techniques for the key hinges for the 18m3grab's upper beams,lower beams and the grab's body,combined with the auxiliary tooling,this article attempts to solve such problems as difficulty in machining,welding stress concentration and welding deformation,which satisfies the requirements of the drawing in concentricity and enables the opening and closing of the grab to accord with the requirements of the drawing in working conditions.

关 键 词:抓斗 焊接变形 焊接应力 机加工精度 同轴度 

分 类 号:TH243[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象