两井定向在花园煤矿井下工程测量中的应用  被引量:1

Application of two-shaft orientation in underground engineering surveying in Huayuan Coal Mine

在线阅读下载全文

作  者:李海亮[1] 左常清[1] 

机构地区:[1]济宁矿业集团花园煤矿,山东金乡272200

出  处:《山东煤炭科技》2014年第7期145-147,共3页Shandong Coal Science and Technology

摘  要:当矿区有两个立井,且两井之间在定向水平上有巷道相通并能进行测量时,就要采用两井定向,两井定向较之一井定向有着精度高,占用井筒时间少的优点,但它需要两套设备(经纬仪、钢尺等)、两组人员,井上下同时作业。目前大多数基建单位不具备这两种条件,花园煤矿就采用了一种简便方法在人员少、仪器少的情况下完成了两井定向工作。When the mining area has two shaft, which are connected by roadway in the directional level and can bemeasured, we must use the two - shaft orientation, two - shaft orientation has high precision, and less time in occupyingthe well compared with one shaft orientation, but it needs two sets of equipment ( theodolite, steel etc. ), two groups ofresearchers, working at the same time in underground. At present, most of the construction units do not have these twoconditions, huayuan coal mine used a simple method under little personnel, instrument completed two - shaft orientationwork.

关 键 词:两井定向 水玻璃 误差分析 

分 类 号:TD175.3[矿业工程—矿山地质测量]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象