检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津商业大学天津市制冷技术重点实验室,天津300134
出 处:《制冷学报》2014年第4期104-107,共4页Journal of Refrigeration
摘 要:为了减小融霜热在融霜过程对冷库库温变化的影响,对库内冷风机增设保温融霜装置,并进行了实验研究。结果表明保温融霜和非保温融霜两种过程,库内上方区域温度均有较大变化。保温融霜过程温度变化相对较小,其整体波动温差比非保温融霜低3.2℃,且保温融霜方式的融霜时间缩短近300 s;证明保温融霜装置在融霜过程中能够起到稳定库内温度和缩短融霜时间的作用。In order to reduce the effect of defrosting heat on the cold storage temperature change during defrosting process,a heat insulation defrosting device is additionally provided to the air cooler in the storage,and the experimental study on the defrosting process was carried out. The results showed that in the defrosting processes with and without heat insulation,the temperature of the upper area in the storage changed greatly. The temperature changes relatively small during the defrosting process with heat insulation,and the overall fluctuating temperature is 3. 2 ℃ lower than that without heat insulation. In the meantime,the defrosting time with heat insulation is shortened by nearly 300s,which proves that the insulation defrosting device can stabilize the storage temperature and shorten the defrosting time in the defrosting process.
分 类 号:TQ051.5[化学工程] TB657[一般工业技术—制冷工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.10