检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《铁道科学与工程学报》2014年第4期80-84,共5页Journal of Railway Science and Engineering
基 金:国家自然科学基金资助项目(51178468)
摘 要:盾构在掘进的过程中,必须确保隧道开挖面前方土体的稳定。将隧道沿纵向简化成平面应变情况,利用双对数螺旋线破坏模式,基于极限分析上限定理,对隧道开挖面前方土体的主动破坏形式进行研究。将盾构机作用在开挖面上的支护力视为均布荷载,得到支护力的上限解,利用Matlab软件编程求解该上限解的最优解,讨论各参数对破坏模式形状和支护力大小的影响。研究结果表明:破坏模式的形状由内摩擦角φ决定;随着黏聚力c和内摩擦角φ的增大,隧道的支护反力σt减小。The stability of the soil in front of the tunnel excavation face should be guaranteed in the process of shield excavation. Simplifying the tunnels into plane strain condition in the longitudinal direction and using failure mechanism of double logarithmic spiral,the active soil failure mechanism in front of the tunnel excavation face was investigated based on upper bound theorem of limit analysis. The upper solutions of supporting forces were obtained by taking the supporting forces acting on the excavation face by shield machine as uniformly distributed loads. A Matlab program was established to obtain the optimal result of the upper bound solutions. The influences of the various parameters on both the value of the supporting forces and the shape of the failure mechanism were discussed at the end of this paper. The results show that the shape of the failure mechanism is determined by internal friction angle φ. With the increase of cohesive force c and internal friction angle φ,the supporting forces σt tend to decrease.
分 类 号:TU921[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229