检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《交通科技》2014年第4期35-38,共4页Transportation Science & Technology
摘 要:运用无应力状态控制法基本原理对大跨度斜拉桥施工控制计算中影响其计算结果闭合的因素进行分析,重点讨论了合龙、支座安装、临时支撑安装和拆除引起的状态不闭合,以及非线性和混凝土收缩徐变影响引起的计算不闭合。并在此基础上总结出斜拉桥无应力控制法闭合条件,以及实现闭合的计算流程。The influence factors on closed conditions of construction control in large span cable-stayed bridge is analyzed in this paper. The unclosed conditions factors in status are caused by bridge closed, bearing installation, temporary support installation and removal. The unclosed conditions factors in calculation are caused by nonlinearity and concrete shrinkage and creep. On this basis, the calculation process of closing conditions by free stress status control method for cable stayed bridge is summed up.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117