检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西电网公司电力科学研究院,南宁530023 [2]南方电网超高压输电公司南宁局,南宁530028
出 处:《广西电力》2014年第4期57-59,62,共4页Guangxi Electric Power
摘 要:超(特)高压输电线路由于导线截面大、分裂数多、档距长,导线的重量和张力大,使得在超(特)高压输电线路上进行带电更换耐张绝缘子或直线绝缘子棒作业难度较大。针对楚穗±800 kV线路耐张双串单片绝缘子或直线复合绝缘子棒的带电更换作业,给出一种简易的力的计算方法,并据此选择适合的工具吨位。该方法简单、实用,适合现场人员使用。The extra (ultra) high voltage transmission line has large conductor section, large bundled number, large distance, and large conductor weight and tension, which make the live-line work of replacing strain insulator or straight line rod insulator in the extra (ultra) high voltage transmission line more difficulty. A simple force calculation method are proposed for the live-line replacement work of double string single plate insulator or straight line composite rod insulator in +800 kV Chu-sui transmission line, based on which the proper tonnage of tools is chosen. The proposed method is simple, practical and suitable for the usage of field personnel.
关 键 词:特高压 ±800 KV输电线路 带电作业 工具选择
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117