检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中冶集团武汉勘察研究院有限公司,湖北武汉430080
出 处:《资源环境与工程》2014年第5期663-665,共3页Resources Environment & Engineering
摘 要:武汉长江隧道工程是中国"万里长江第一隧",其勘察技术要求高,施工难度大,采用常规勘察方法难以解决水上钻探与测试定位困难,砂土层取芯率低,热物性等特殊岩土参数测试,长江上地下水流速与流向测试困难等难题,为此采用组合锚定位、动态跟踪纠偏技术、江上同位素示踪法地下水流速、流向测试、江上勘探深度监控技术、砂土旋切式钻探工艺等方法圆满解决了遇到的工程难题,为武汉长江隧道工程建设提供了准确的岩土工程勘察资料。Yangtze river tunnel project in Wuhan is the first tunnel through Yangtze river in China,high technical require-ment for geotechnical engineering investigation is necessary,but its construction is difficult. Conventional survey methods are difficult to solve positioning of water drilling and testing difficulties on Yangtze river,low core recovery percentage of sand,special geotechnical parameters indicators testing such as thermal property,groundwater flow rate and flow on Yan-gtze river testing problems,and so on. therefore by adopting many anchors combination positioning,dynamic tracking cor-rection technology,isotope tracer method testing groundwater flow velocity and direction,exploration depth monitoring technology,rotary cutting type drilling technology of sand satisfactorily solve the geotechnical engineering investigation problems and provide accurate geotechnical engineering data for the wuhan Yangtze river tunnel project construction.
关 键 词:武汉长江隧道 岩土工程勘察 同位素示踪法 旋切式钻探 动态跟踪纠偏
分 类 号:U452.11[建筑科学—桥梁与隧道工程] P642[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.190.207.156