检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学道路与交通工程教育部重点实验室,上海201804
出 处:《同济大学学报(自然科学版)》2014年第12期1861-1867,共7页Journal of Tongji University:Natural Science
基 金:上海市科学技术委员会科研计划(1123120300)
摘 要:为了掌握城市轨道交通车站出站端自行车接驳特征,定量描述出站端潜在自行车接驳分担率转移规律,以日本东京都为例,选取570个车站进行调查,总结不同区域自行车接驳分担率变化规律,得出其与车站密度、设施配置的关系.在此基础上,筛选出30组车站-交通小区对调查其接驳距离、步行及公交接驳时间、费用等,探讨接驳距离、步行与公交接驳时间差、公交在车时间比对出站端潜在自行车接驳分担率转移的影响,通过多元非线性拟合,建立出站端潜在自行车接驳分担率转移模型并验证.To grasp the characteristics of bicycle as an egress mode of urban mass transit and give a quantitative description of transfer rule of potential bicycle share on the egress journey, 570 stations in Tokyo were chosen to be analyzed. The relationship was revealed among the bicycle share on access/egress journey in different zones and station density as well as infrastructure. Investigation of egress distance, walk and bus egress time and fare between 30 couples of stations and transport zones shows that time difference between walk and bus on egress journey and the ratio of riding time to total bus egress time have an influence on transfer of potential bicycle share on the egress journey. Transfer model of potential bicycle share on the egress journey in urban mass transit was established by multiple nonlinear fitting survey data to identify the impact of these two factors quantitatively.
关 键 词:城市轨道交通 出站端接驳 潜在自行车接驳分担率转移模型 实证分析
分 类 号:U291[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229