检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖凯刚[1]
机构地区:[1]中铁第四勘察设计院集团有限公司,湖北武汉430063
出 处:《铁道建筑》2014年第12期43-46,共4页Railway Engineering
摘 要:山西中南部铁路通道将开行30 t轴重列车,荷载计算与有限元数值分析表明,列车轴重增加后位于富水软弱围岩及土质地层段隧道基底应力增大,在列车活载反复作用下隧道底部易形成病害。本文论述了对已先期建成的隧道进行基底加固的必要性,论证了采用隧底注浆方案进行基底加固合理可行。Heavy haul train with an axle load of 30 t will be put into service at the Shanxi-Henan-Shandong railway thoroughfare. T he results of loading calculation and finite element analysis indicate at water-rich area with weak surrounding rocks and soil,such axle load may increase the strain of the tunnel foundation. U nder such conditions, tunnel defaults may occur under the train live load. T he paper elaborates the necessities in the reinforcement of pre-inforced tunnel and proposes that grouting approach is to be used to resolve the concern.
分 类 号:U457.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117