地铁车站深基坑现场实测研究  被引量:4

Research on Field Measurement of Deep Excavation for Subway Station

在线阅读下载全文

作  者:王艳芳[1] 周治刚 

机构地区:[1]南京大学金陵学院,江苏南京210093 [2]江苏省水利工程科技咨询有限公司,江苏南京210029

出  处:《现代交通技术》2014年第6期71-73,共3页Modern Transportation Technology

摘  要:以南京地铁某车站深基坑为工程背景,对基坑变形及周边建筑沉降进行数据分析,结果表明:基坑侧向变形的最大值一般出现在基坑开挖面附近;地表沉降在开挖前期、中期变化速率较大,后期基坑处于趋稳状态,地表沉降速率减缓;基坑开挖对于无桩基础建筑物的影响要远大于有桩基础建筑物,开挖期间尤应加强临近基础薄弱的建筑物的监测与监控。Taking a deep excavation of Nanjing subway station as project background, this paper studied excavation deformation and surrounding buildings settlement.The conclusions were as follows: the maximum value of lateral deformation of excavation generally occured near the excavation surface; surface subsidence rates in excavation early-term and medium-term were bigger than late-term because supporting facilities for deep foundation excavation almost had been set up completely. On later stage, deep excavation was going to a stabilization state, therefore surface subsidence rate slowed down. Influences of excavation to no- pile foundation building are much more than pile foundation building, so monitoring and controlling of weak foundation buildings nearby should be strengthened during excavation.

关 键 词:深基坑 侧向变形 地表沉降 地铁车站 

分 类 号:U231.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象