检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国港湾建设》2015年第1期35-38,共4页China Harbour Engineering
摘 要:通过埋设在桩端以下地基土中的孔隙水压力计实测出罐体施工前、充水、稳定及放水各个阶段桩端不同位置、不同深度处土体孔隙水压力,分析大型群桩基础地基的孔隙水压力分布及对压缩层的影响范围。提出了大型油罐地基桩基沉降计算深度与基础宽度的关系,对指导软土地区罐体群桩基础设计具有一定的借鉴作用。The pore water pressure gauge was laying in the foundation soil under tip of pile to survey pore water pressure under different position and different depth at each stage before tank construction,full water,stabilization and flowing.We analyzed the distribution of pore water pressure and the influence range of compression layer for large scale pile group foundation.The relationship between large scale oil tank pile foundation settlement calculation depth and foundation breadth was presented,which was used for guiding the design of pile group foundation in the soft soil area.
分 类 号:U655.544[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.89.220