检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兰州交通大学,兰州730070
出 处:《公路交通技术》2015年第1期102-105,共4页Technology of Highway and Transport
摘 要:随着我国大力发展公路基础设施建设,公路隧道的建设越来越多,且大部分都建于软弱围岩地段。然而在隧道施工过程中软弱围岩的大变形一直是困扰隧道施工的主要问题。对篮家岩隧道软弱围岩中的大变形机理进行系统分析,并提出综合控制措施,以期对今后拟建隧道遇到同类问题的预防和处理有所帮助。With rapid development of construction of highway infrastructures in China,more and more highway tunnels are constructed and most of them are constructed at weak wall- rock sections. However,large deformation of weak wall rocks during construction of tunnels has been a main problem that puzzles construction of tunnels. This paper systematically analyzes the mechanisms of large deformation in weak wall rocks of Langjiayan Tunnel and proposes comprehensive control measures,hoping to facilitate prevention and treatment for the problems of the same kind encountered in tunnels to be constructed in the future.
分 类 号:U455.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30