检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国南方电网超高压输电公司南宁局,南宁530021
出 处:《广西电力》2015年第1期53-56,共4页Guangxi Electric Power
摘 要:为了提高线路的运行可靠性,对带电更换±800 kV直流输电线路耐张塔长棒形瓷绝缘子的方法进行探讨。提出带电更换耐张塔长棒形瓷绝缘子的作业方法,并对作业方法的安全性进行全面分析、验证。对承力工具受力进行计算分析后,研制出整套作业工器具。现场实践证明,提出的作业方法及研制的工器具安全可靠、操作便捷,成功实现了带电更换±800 kV普侨直流输电线路耐张塔长棒形瓷绝缘子,对提高特高压直流带电检修技术及提升电网可靠率具有重要的意义。In order to improve the operation reliability of line,the live-line replacement method of long rod porcelain insulator in strain tower of ± 800 kV DC Transmission line is discussed.The working method of the live-line replacement of long rod porcelain insulator in strain tower is proposed,the safety of which is completely analyzed and testified.A set of tools are developed after the force calculation analysis of bearing tools.Field practice proved that the working method proposed and tools developed are safe,reliable and easy to be operated,which successfully realizes the live-line replacement of long rod porcelain insulator in strain tower of ±800 kV DC Transmission line and has important significances to the improvement of the live-line maintenance technology of EHV DC and the power grid reliability.
关 键 词:±800 kV直流输电线路耐张塔 长棒形瓷绝缘子更换 带电作业 工器具研制
分 类 号:TM755[电气工程—电力系统及自动化] TM216.1[一般工业技术—材料科学与工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62