检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510230
出 处:《水运工程》2015年第2期213-218,共6页Port & Waterway Engineering
摘 要:为安全可靠地降低防浪墙顶高程,在分析国内外规范对越浪量标准界定的基础上,为港珠澳大桥珠澳口岸人工岛填海工程海堤拟定了运营工况、设计工况和校核工况这3种工况组合和相应的允许越浪量标准,结合物理模型试验,对海堤越浪量进行优化设计,使人工岛地面与挡浪墙之间的高差减少到人体正常身高范围,可为过境旅客提供海天一色的景观视线。In order to reduce the top of the seawall elevation safely and reliably,we analyze the domestic and international norms of the tolerable overtopping limit,and study the operation condition,design condition and check condition and corresponding tolerable overtopping limit for three conditions for Hongkong-Zhuhai-Macao bridge Zhuhai-Macao frontier port artificial island reclamation works.Combining the physical model test,we carry out the optimal design of wave overtopping of seawall.By controlling the height difference between the artificial island ground and the top of the seawall elevation in the range of normal human height,we can offer well sky and sea view for passengers.
分 类 号:U656.314[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30