检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]安徽省电力公司电力经济技术研究院,安徽合肥230022
出 处:《中国电力》2015年第3期84-87,共4页Electric Power
摘 要:首先从用电结构上分析了年统调最大用电负荷的特性,将最大负荷分解为相互独立的3种负荷:基础负荷、居民空调负荷、非居民空调负荷。在此基础上,运用计量经济学原理,逐步分析影响3种负荷的经济因素和气象因素。最后建立了包含经济、气象因子在内的最大负荷预测模型。模型从根本上解释了最大负荷的影响因素,并将预测精度控制在3%范围内,预测精度满足负荷预测实际工作的需求,具有一定的应用价值。This paper analyzes the features of the centrally dispatched maximum power load (referred to as "maximum load") from the characteristics of electricity consumption structure and decomposes the maximum power load into three separate loads: base load, residents' air conditioning load and non-residents' air-conditioning load. Upon the decomposition, econometric methods are applied to analyze the economic and meteorological factors of each load. The paper finally establishes the maximum load forecasting model including economic and meteorological factors. The model explains the fundamental factors influencing the maximum load; the forecasting error is controlled within 3%, which meets the requirement of load forecasting practice and has certain applied values.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49