检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜冠群
机构地区:[1]上海城建市政工程集团有限公司,上海市200065
出 处:《城市道桥与防洪》2015年第1期151-155,170,共6页Urban Roads Bridges & Flood Control
摘 要:为了保证盾构法隧道的施工质量,推导了盾构隧道施工中隧道设计轴线、管片成型轴线和盾构机推进轴线三者之间的关系,建立了通用管片排版优化与纠偏控制计算方法,开发了相应的软件,并将其应用于宁波市轨道交通1号、2号线盾构施工中。结果表明该计算方法和软件符合工程要求,为高效安全施工提供了保障。In order to guarantee the construction quality of tunnel by shield method,the relationship among three parts of tunnel design axis,segment forming axis and shield machine advancing axis in the shield tunnel construction is deduced,the composing optimization and deviation rectifying control computation method is established,and the relative software is developed,which are used in the shield construction of Rail Traffic Line 1 and 2 of Ningbo City.The result shows that the computation method and software satisfy the engineering requirements,and provide the guarantee for the high efficient safe construction.
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.68.176