检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《现代交通技术》2015年第2期32-35,共4页Modern Transportation Technology
摘 要:为了研究竖向地震力作用对钢筋混凝土桥墩时程响应的影响,利用有限元软件Open Sees对不同地震波、长细比及轴压比情况下考虑竖向地震力前后的钢筋混凝土桥墩进行时程分析。对比各个工况下桥墩的时程响应,结果表明:竖向地震力作用对桥墩的时程响应有较大影响。因此在对钢筋混凝土桥墩进行抗震分析时,建议考虑竖向地震力作用。In order to study the effect of vertical earthquake ground motion on time history response of reinforced concrete bridge piers, time history analyses are performed on several conditions, which include only horizontal earthquake ground motion works and horizontal and vertical earthquake ground motion work together on different seismic waves, slenderness ratios and axial compression ratios, using the finite element software OpenSees. Comparing the results of time history response of the bridge pier on these conditions, conclusion can be got that vertical earthquake ground motion has great effect on the time history response of the piers. It is therefore suggested that vertical earthquake ground motion should be considered in the seismic analysis of reinforced concrete bridge piers.
分 类 号:U442.55[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249