机构地区:[1]江苏交通控股有限公司,江苏南京210002 [2]东南大学,江苏南京210096
出 处:《现代交通技术》2015年第2期40-42,57,共4页Modern Transportation Technology
摘 要:针对钢筋混凝土连续弯箱梁产生较大横向位移以及固定支座墩柱变形开裂情况,通过理论分析,从受力特点、计算分析以及超高车辆撞击力的作用等多方面,探讨了产生侧移的原因。通过将中间固定支座柱式墩改造成墙式薄壁固结墩、顶升箱梁更换支座和加强桥台处横桥向挡块等一系列措施,对其进行了维修改造设计和施工,通过运营使用,说明改造设计是合理可行的,取得了良好的效果。For a reinforced continuous curved box girder, lateral displacement took place, and deformation and cracking occurred in fixed bearing pier. Through theoretical analysis, this paper discussed the causes of lateral placement, taking many factors into consideration, such as mechanical characteristics, computational analysis, the impact of hit by high truck and so on. The series of treatments of changing the column pier of the middle fixed bearing into thin-walled fixed pier, replacing the bearings following jacking the box girder and strengthening the stopper in the transverse direction were carried out in the design and construction of the maintenance for the bridge. The reconstruction design was proved to be reasonable and practicable, which achieved good effect.
关 键 词:连续弯箱梁 侧向位移 力学分析 顶升 固结墩 处治对策
分 类 号:U448.215[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222