检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《洛阳理工学院学报(自然科学版)》2015年第2期17-21,共5页Journal of Luoyang Institute of Science and Technology:Natural Science Edition
基 金:陕西省工业攻关计划(2013K06-27)
摘 要:为了准确预报隧道掌子面前方施工过程中富水带、软弱层、断层和破碎带等地质结构的具体位置和宽度,采用高密度电法方法进行预测。通过预测结果和实际开挖的地质情况进行比较,结果发现:高密度电法预测的地质结构与实际地质状况基本一致。实践证明:高密度电法具有成本低、效率高、勘察距离长、效果明显等优点,是隧道地质超前预报行之有效的方法之一。In order to accurately forecast the location and width of geologic structures like groundwater enriched zone, weak layer and fault fracture zone before the tunnel face in the process of construction, the high density resistivity method has been used to make the forecast. The prediction results and the practical geological situation of the excavatio nare found closely consistent in comparison. Prac- tice proves the high density resistivity method one of the effective methods for advanced geological prediction of tunnels owning to its ad- vantages of low cost. high efficiency, long exploration distance and obvious effects.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147