检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱春兰[1]
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《铁道标准设计》2015年第7期152-154,共3页Railway Standard Design
摘 要:为充分发挥快速铁路效益,满足区域城市交通运输需求,既有线提速开行动车组工程项目将日益增多,等级转换点的设置问题也将在设计中成为一个必须研究的课题。结合既有集包增建二线实施CTCS-2级列控系统工程,针对既有线的实际情况对C0/C2等级转换点的设置问题进行探讨,提出等级转换点的设置应在满足线路运输组织方式、尽量提高铁路线路运输能力的前提下必须考虑列车运行速度及制动距离等因素的结论。In order to ensure the benefit of high-speed railways and meet the demand of regional urbantransportation, the projects to allow existing railway lines to run multiple unit trains are in a rise. Thus,the setup of CTCS level transition point becomes a subject in the design. With reference to theimplementation of existing railway additional second-line of Jining-Baotou CTCS-2 train control systemrenovation project, the issue of CTCS-0 to CTCS-2 level transition point setup is addressed according tothe actual situation, and the conclusion shows that the factors of operating speed and braking distanceshould be considered on the premise of meeting the demand of railway line transportation mode as well asimproving the railway transport capacity as far as possible in CTCS level transition point setup scheme.
关 键 词:既有铁路 列控系统 等级转换点 设置 速度 制动距离
分 类 号:U284[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28