检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张晓清[1] 张孟喜[1] 吴应明[2] 李磊[1] 王有成[1]
机构地区:[1]上海大学土木工程系,上海200072 [2]中铁二十局集团有限公司,西安710016
出 处:《上海交通大学学报》2015年第7期1040-1045,共6页Journal of Shanghai Jiaotong University
基 金:国家自然科学基金资助项目(41172238)
摘 要:多线叠交软土盾构隧道是随地铁建设不断发展而出现的一种复杂隧道空间布置形式.针对多线叠交盾构隧道垂直上、下穿2种典型穿越施工形式,借助室内模型试验,根据盾构隧道近接施工的技术特点和控制要求,采用排液法,重点分析了多线叠交盾构隧道在各穿越阶段下因地层损失和开挖卸荷引起的地表沉降以及既有隧道纵向变形规律.分析结果可为今后类似多线叠交盾构隧道工程的设计和施工提供理论指导.With the unceasing development of the metro construction, multi-line overlapped shield tunnels in soft soil are being built as a complex spatial distribution. For two kinds of typical construction methods of up-crossing and under-crossing, model test research was applied to analysis the dynamic construction process. According to the shield tunneling technology characteristics and control requirements of approac- hing construction, the drainage method was applied to selective analysis of the surface subsidence and the existing tunnel longitudinal deformation caused by formation damage and excavation unloading of multi-line overlapped tunnel at various stages. The research results can provide some theoretical basis and prophase guidance for similar projects in the future.
分 类 号:U456.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185