多线叠交盾构隧道近接施工模型试验  被引量:25

Model Test on Approaching Construction of Multi-line Overlapped Shield Tunnelling

在线阅读下载全文

作  者:张晓清[1] 张孟喜[1] 吴应明[2] 李磊[1] 王有成[1] 

机构地区:[1]上海大学土木工程系,上海200072 [2]中铁二十局集团有限公司,西安710016

出  处:《上海交通大学学报》2015年第7期1040-1045,共6页Journal of Shanghai Jiaotong University

基  金:国家自然科学基金资助项目(41172238)

摘  要:多线叠交软土盾构隧道是随地铁建设不断发展而出现的一种复杂隧道空间布置形式.针对多线叠交盾构隧道垂直上、下穿2种典型穿越施工形式,借助室内模型试验,根据盾构隧道近接施工的技术特点和控制要求,采用排液法,重点分析了多线叠交盾构隧道在各穿越阶段下因地层损失和开挖卸荷引起的地表沉降以及既有隧道纵向变形规律.分析结果可为今后类似多线叠交盾构隧道工程的设计和施工提供理论指导.With the unceasing development of the metro construction, multi-line overlapped shield tunnels in soft soil are being built as a complex spatial distribution. For two kinds of typical construction methods of up-crossing and under-crossing, model test research was applied to analysis the dynamic construction process. According to the shield tunneling technology characteristics and control requirements of approac- hing construction, the drainage method was applied to selective analysis of the surface subsidence and the existing tunnel longitudinal deformation caused by formation damage and excavation unloading of multi-line overlapped tunnel at various stages. The research results can provide some theoretical basis and prophase guidance for similar projects in the future.

关 键 词:盾构隧道 多线叠交 近接施工 模型试验 

分 类 号:U456.3[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象