作 者:程鹏
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051
出 处:《云南水力发电》2015年第5期115-119,共5页Yunnan Water Power
摘 要:介绍糯租水电站首部地形地质条件和昆河铁路对首部枢纽设计及施工的影响,提出保证铁路不中断运行的首部枢纽设计方案。并详细介绍软基上重力坝的设计。铁路运输实现了在大坝施工中畅通目标,且路基安全稳定。糯租水电站已经安全运行了近7年,建基于软基上的拦河坝未发现任何不良状况,安全监测资料也显示运行状况良好。The paper gives an introduction to the topographical and geological conditions of the head complex of Nuozu hydropower project and to the infl uence of the Kunming-Hekou railway on both design and construction of the head complex. The paper put forward the design proposal of the project head complex, which will ensure the normal operation of the railway without interruption. The paper also explains the design of the gravity dam founded on a soft foundation. The transportation by railway implemented the successful construction of the dam, and the railway foundation is safe and stable. Nuozu hydropower station has already operated for 7 years and its dam founded on a soft foundation has been in a good state. The dam instrumentation shows that the dam has been under successful operation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26