检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网宁夏电力公司电力科学研究院,宁夏银川750011 [2]国网宁夏电力公司调度控制中心,宁夏银川750001
出 处:《宁夏电力》2015年第5期14-19,共6页Ningxia Electric Power
摘 要:为保证宁夏电网330/220 k V电磁环网解环后电网的安全稳定运行,运用电力系统分析综合程序(Power System Analysis Software Package,PSASP),对电磁环网解环前后电网在三级稳定标准涉及的各种故障形式下进行暂态稳定计算,对比分析解环前后系统电压与频率波动以及功角阻尼比的变化。计算结果表明:330/220k V电磁环网解环对于宁夏电网的暂态稳定特性影响不大,解环后不会增加暂态失稳事故风险,解环条件一旦具备,应该及时实施解环。In order to guarantee the safe and stable operation of power grid after 330/220 k V electromagnetic loop network looping-off for Ningxia power grid,using Power System Analysis Software Package(PSASP),makes transient stability calculation under various fault forms relating to three levels stability standard for power grid before and after 330/220 k V electromagnetic loop network looping-off,and compares and analyzes the system voltage and frequency fluctuation and the changes of power-angle damping ratio before and after looping-off. The calculation result shows that 330/220 k V electromagnetic loop network looping-off has little influence on transient stability characteristic of Ningxia power grid,after looping-off,the transient instability risk would not increase,when looping-off conditions are just right,should implement in time.
分 类 号:TM711[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229