检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海交通大学工业工程与管理系,上海200240
出 处:《计算机集成制造系统》2015年第11期3088-3094,共7页Computer Integrated Manufacturing Systems
基 金:上海市自然科学基金资助项目(13ZR1422700);智能制造装备发展专项资助项目~~
摘 要:为了给具有复杂结构和高拆卸成本的系统提供维护方案,引入拆卸作业对维护的影响,提出基于时间阈值的可拆卸多部件系统机会维护策略。在运用N叉树形结构和拆卸序列规划表达拆卸结构的基础上,构建考虑随机故障与机会维护时机的多部件机会维护模型,并通过最小化规划工作时间内的系统维护总成本获得优化的机会维护时间阈值。基于Monte Carlo仿真的算例分析表明,该策略具有可行性。To effecively support the maintenance decision for the system with complicated structure and high disassembly cost,an opportunistic maintenance policy based on time threshold was proposed for multi-component system by considering the influence of disassembly on system maintenance.On the basis of N-ary tree and disassembly sequence planning,a multi-component system maintenance model which involved both stochastic failures and maintenance opportunities was constructed.The optimal maintenance time threshold was obtained based on Monte Carlo simulation by minimizing the total maintenance cost of system within the given mission interval.The analysis of example showed the effectiveness of proposed method.
关 键 词:多部件系统 机会维护 拆卸序列 随机故障 MONTE Carlo仿真
分 类 号:TP16[自动化与计算机技术—控制理论与控制工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28