检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏科技大学能源与动力工程学院,江苏镇江212003
出 处:《江苏科技大学学报(自然科学版)》2015年第5期421-425,共5页Journal of Jiangsu University of Science and Technology:Natural Science Edition
基 金:江苏省产业化基金资助项目(BA2013065)
摘 要:为实现船舶总装制造精细化管理,改变生产过程中工时定额传统的管理模式,提高分段总组装配定额管理的准确性,实现合理派工.利用TRIBON M3设计的船舶结构和舾装几何数据,对装配计划所定义零部件的装配信息与外部数据库定义的定额标准进行匹配性关联开发,形成以装配计划树为层级关系,匹配组立与零件属性的信息,关联外部相应工种定额信息的工时表、派工单,避免人工定额的粗放管理,提高船企管理效率与精度.In order to achieve the fine management in shipfitting,we change the traditional mode of ship companies in the process of production management about man-hour and production quota,improve accuracy of the management about man-hour and production quota in shipfitting and achieve a reasonable tasking. By using the data of ship structure and outfitting in TRIBON M3,we develop and set up the correlation between the assembly information of the parts defined by assembly planning and the data of man-hour and production quota defined in the external database,to achieving the goal that the formation of man-hour list and work card including the class of assembly planning tree,the matching attribute information between assemblage and the parts as well as quota information. We avoid the extensive management of the manual importing mode about man-hour and production quota,at the same time increase efficiency and precision of production management in shipyard.
关 键 词:分段装配 生产管理 数据关联 TRIBON M3
分 类 号:U662.9[交通运输工程—船舶及航道工程] TP391.4[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.173