检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯俊雅
出 处:《价值工程》2016年第3期29-30,共2页Value Engineering
摘 要:土木工程项目通常都伴随着巨大投资,考虑到资金的有限性和最大利用率,因而,其决策过程就显得尤为重要。方案经济比选是工程项目经济评价的重要内容。在对计算期不同的互斥方案进行比选中,应用净现值法进行方案比选时,最小公倍数法与研究期法是进行经济评价时常用的两个方法。最小公倍数法与研究期法都考虑了时间的可比性,使其在相同的计算期下进行比较,二者在应用时存在着内在一致性,又存在着差异性。运用所学知识来论证两个常用处理方法的优劣。Civil engineering projects are usually companied with a large number of investment. Take finiteness and maximum utilization of fund into consideration, it is dramatically important to make a strategic decision, The plan comparison and selection of economic is the key part in economic evaluation of project. Method of least common multiple and method of investigate phase are usually used in comparison and selection between mutually exclusive alternatives to get economic evaluation. Method of least common multiple and method of investigate phase all take comparability of time into account to compare projects in the same given period. There are inherent similarities and differences between Method of least common multiple and method of investigate phase. This paper aim to argue the advantage and disadvantage with knowledge what we have learned.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43