钢绞线锚入式预制砼框架节点构造及试验  被引量:11

Structural measures and experimental study of precast concrete joints of anchored prestressing strands in frames

在线阅读下载全文

作  者:管东芝[1,2] 郭正兴[1,2] 于建兵[1] 杨森[1] 

机构地区:[1]东南大学土木工程学院,江苏南京210096 [2]东南大学混凝土及预应力混凝土结构教育部重点实验室,江苏南京210096

出  处:《浙江大学学报(工学版)》2016年第2期282-291,共10页Journal of Zhejiang University:Engineering Science

基  金:国家"十二五"科技支撑计划资助项目(2011BAJ10B03)

摘  要:为了解决常见预制混凝土框架节点生产安装难度大的问题,提出钢绞线锚入式新型预制混凝土框架梁柱节点形式.针对构造措施设置概念进行讨论,为了研究其中2个关键构造措施的有效性,开展4个足尺预制节点的低周反复荷载试验.这2个构造措施分别为增设附加直钢筋和预制梁下部架立筋增设无黏结段.结果表明,附加直钢筋能够有效增强钢绞线锚入式新型预制混凝土框架梁柱节点的抗震性能;预制梁下部架立筋局部无黏结段对节点性能影响较小,建议去除该措施;塑性铰外移的构想未能实现,但强柱弱梁设计原则可以保证该节点破坏模式为梁铰破坏.A new precast concrete joint of anchored prestressing strands was proposed to make contruction of precast beam-to-column connections easier.Concepts of structural details in the proposed system were discussed.Four full-scale cruciform specimens were tested under pseudo-static loadings to evaluate two structural details.Those are additional bars and a small unbonded length of two bottom deformed bars in a precast beam.Results show that additional bars can effectively improve overall seismic resistance of the proposed system.A small unbonded length of two bottom deformed bars in a precast beam has little influence on structural performance of test specimens,therefore it can be removed.Making plastic hinge away from the interface between beams and columns does not work by adopting the proposed measures.Strong column-weak beam philosophy is effective for the new joint to ensure concentration of main damage at beam ends.

关 键 词:预制混凝土 框架 节点 构造 

分 类 号:TU375[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象