检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王占东[1]
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《铁道标准设计》2016年第4期82-86,共5页Railway Standard Design
摘 要:宝兰客运专线马鞍梁隧道Ⅵ级围岩地段处于富水的松散地层中,下穿浅埋沟谷,工程力学条件差、施工风险大,隧道设计方案的选择不仅对工程施工安全、进度和投资影响较大,甚至会对工程的运营安全带来影响。通过工程实例研究客运专线隧道Ⅵ级围岩地段主要工程特点,提出Ⅵ级围岩隧道设计的合理方案。通过工程类比法及数值分析确定结构支护参数,采用全包防水理念,并辅以井点降水及注浆加固等措施改善地层,保障了Ⅵ级围岩隧道工程的施工安全,方案经济合理。Ma Anliang tunnel of Ⅵ class of surrounding rock on Baoji-Lanzhou high-speed dedicated passenger line is located in loose strata with rich water, passing shallow valley and facing very complex engineering mechanics conditions and great construction risks. The selection of tunnel designing scheme may bring big impact not only on engineering construction safety, progress and investment but also on future operational safety. The aim of the paper is to study the characteristics of Ⅵ class rock railway tunnel and to put forward reasonable scheme. By means of numerical simulation and comparison analysis, all inclusive waterproofing concept supplemented with well point dewatering and grouting reinforcement measures is proposed to protect the safety of the Ⅵ class rock tunnel construction. The scheme is applicable and economical.
关 键 词:客运专线铁路 铁路隧道 Ⅵ级围岩 浅埋隧道 富水隧道 设计
分 类 号:U238[交通运输工程—道路与铁道工程] U452[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.55