检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁二院工程集团有限责任公司,成都610031 [2]中铁二院昆明勘察设计研究院有限责任公司,昆明650200
出 处:《铁道标准设计》2016年第5期64-68,共5页Railway Standard Design
摘 要:在顶推施工过程中,由于滑道高程控制不精确、施工管理不当等因素会导致支座脱空,从而导致支反力的重分布,某些支座支反力必然增加,在支撑位置附近局部应力会比较突出,所以有必要研究支座脱空对混凝土箱梁受力性能的影响。结合某预应力混凝土连续箱梁桥顶推施工实例,通过建立三维有限元实体模型,选取某工况下的支座发生脱空进行分析。计算结果表明:支座脱空对支座支反力及箱梁的局部应力影响比较大,减小了顶板受拉和底板的受压安全储备,梁体下挠位移增大,增加了摩阻力,应在施工过程中严密监控支座,避免发生支座脱空。During incremental launching, the inaccurate control of slide elevation and improper construction management may lead to bearing disengaging,which results in redistribution of the reactionforce and inevitable increase of some support reaction,thus,local stress is obvious near the support location. So it is necessary to study theeffect of the bearing disengagement on the mechanic performance of the concrete box girders. Based on the practice of incremental launching of a certain pre-stressed concrete continuous box girder bridge,a three-dimension finite element solid model is established and bearing disengagements under certain working conditions are analyzed. The results of the calculation indicate that the influence of bearing cavity on support reactions of concrete box girders and the local stress is relatively remarkable and the safety reservation of the roof and floor is reduced,and the beam displacement is enlarged and friction is increased as a consequence. Thus,bearings should be closely monitored in the construction process to avoid bearing cavity.
分 类 号:U445.462[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222