石漠化综合治理二期工程创新管理机制探讨  被引量:1

Study on Rock Desertification Comprehensive Control 2nd Phase Project Innovative Management Mechanism

在线阅读下载全文

作  者:吴协保[1,2] 但新球[1,2] 白建华[2] 吴照柏[1,2] 

机构地区:[1]国家林业局中南林业调查规划设计院,长沙410014 [2]国家林业局石漠化监测中心,长沙410014

出  处:《中南林业调查规划》2015年第4期62-66,共5页Central South Forest Inventory and Planning

摘  要:对石漠化综合治理一期工程的管理机制和体制,从组织领导、工程建设、资金投入、运行机制和监测评价等方面,进行了认真总结与分析;同时针对我国经济发展的客观实际与石漠化综合治理一期工程中存在的问题,创新性地对石漠化综合治理二期工程管理提出了"二大机制三大体系",科学解决了一期工程管理中存在问题,为二期工程顺利推进提供支撑。This Paper summarized and analyzed the organization, construction, investment, operational mechanism, monitoring and evaluation of rock desertification comprehensive control 1st phase project, then based on the economy development status of China and the problems of the 1st phase project, this paper put forward the innovative ideas of ' two major mechanisms and three major systems' for the 2nd phase project, Which solved the problems of 1 st phase, and push forward the rock desertifieation comprehensive control 2nd phase project.

关 键 词:石漠化 综合治理 二期 管理机制 创新 

分 类 号:X171.4[环境科学与工程—环境科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象